(earth works for railway roth ( Tajora
Section
The scope of our work in this project is to construct the
body of railway roth by .using of 80000 m3 of soil,
the average height of embankment 8 m
The progress of work in this project is 100%
Owner information
Name : Railway Authority (Tajora Section )
Tele : ++218-21-3705175
( Maintenance for sanitary system for
El-wahat hotel ( Tripoli
The scope of our work in this project is to remove all the
water supply and sewer pipes and all toilette fixtures for
250 rooms and install a new water supply and .sewer pipes
and new fixtures complete with new wall and floor ceramic
tiles
The progress of work in this project is 100%
Owner information
Name : AL DAMAN COMPANY FOR HOTELS
(Demolishing of existing multi story
building ( Tripoli
The scope of our work in this project is to demolish a steel
structures 4 store .building in hosing complex
The progress of work in this project is 100%
Owner information
Name : SANDOQ AL DAMAN AL-EGTEMA ( Social Assurance )
4.4-Sport yard in Melitha JTS Camp
The scope of our work in this project is to construct a
sport yard consist of tow tennis court and tow basket ball
complete with all sport equipment and fence in AGIP and JTS
camp .
Owner Name : LEGNAMI PASOTTI COMPANY
Car paring shade and electrical
generator shelter in AGIP & JTS camp and office
The scope of our work in this project is to supply materials
and install the elevated steel structures shelter for 8
location of electrical generator and 90 car paring in
the progress of work in this project 100%
Owner : Sewage
4.6- Pipe laying and testing ( Mellitah site )
The scope of our work in this project is to supply and to
laying of carbon steel pipes, laying of uPVC pipes for
utility water and sewage and sea water including all fitting
installation and civil works and hydro-tests.
Owner : LEGNAMI PASOTTI COMPANY
(Oil and Pipelines Crossing with
railway( Mellitah site
The scope of our work in this project is to carry all the
civil works for crossing works which include excavation,
concrete works of 190 m3 and backfilling .
the progress of work in this project 100%
Owner Information :
Name : CHINA PETROLEUM ENGINNERING CONSTRUCTION CORP.
( CPECC)
( Mellitah Pig Trap Station Civil
Works ( Mellitah site
The scope of our work in this project is to carry all the
civil works for Mellitah Pig Trap Station which include site
leveling and grading construct the valves and instruments
foundation and general arrangement and layout of the working
area and the site .
the progress of work in this project 100%
Owner Information :
Name : CHINA PETROLEUM ENGINNERING CONSTRUCTION CORP.
( CPECC)
(Electrical and Instrumentation Cable
Trenches( Mellitah site
The scope of our work in this project is to carry all the
excavation and backfilling works for electrical and
instrumentation cables trenches.
the progress of work in this project 100%
Owner Information
Name : JTS
Electrical and Instrumentation Cable Sand bedding and Sand
backfilling and Tails (installation ( Mellitah site
The scope of our work in this project is to supply materials
and carry all the sand bedding and sand backfilling and
tails installation for all electrical and instrumentation
cables trenches .
the progress of work in this project 100%
Owner Information
Name : GEMMO
(Maintenance for West Water Treatment Plant( Mellitah site
The scope of our work in this project is to remove existing
geomembrance for aeration lagoon and rework side slopes
including all civil works and supply and installation of new
geomembrance,
The work include temporary connections and operation during
maintenance.
the progress of work in this project 100%
Owner Information :
Name : LEGNAMI PASOTTI COMPANY
|